Installation of grout bags and provision of grouting equipment with a confined deck space to support Perenco’s Lucina gas line freespan correction campaign
THE CHALLENGES
PREPARATION
Four different models of ULO’s grout bags were required to meet the requirements of the 16-inch and 18-inch pipelines. Mobilised its proprietary equipment to support the process of installation and filling of the grout bags. quipment was modified for the project due to the limited space on board the vessel. These modifications allowed for the continuous feed of bagged cement despite space restrictions.
OUTCOME
An in-house team of ULO’s technical staff was allocated to the project and remained onsite for the duration of the project, supervising and operating the equipment as well as ensuring the client’s specifications were met and ULO’s quality standards were adhered to at every stage.