2021 Subsea 7 Saudi Aramco Marjan Field Saudi Arabia Structural grouting – Drilling Support Jackets
2021 Heerema TenneT Hollandse Kust Zuid Netherlands Structural grouting – Beta Substation
2020 DEME MOWEL Moray East Offshore Wind Farm (OWF) Scotland Structural grouting – Wind Turbine Generator (WTG) & Offshore Sub-Station (OSS) platforms
2020 Heerema Ørsted Wind Power Hornsea II Offshore Wind Farm (OWF) England Structural grouting – Wind Turbine Generator (WTG) & Reactive Compensator Substation (RCS) platforms
2020 Heerema Total E&P Tyra Redevelopment Phase 1 and 2 Denmark Structural grouting – Gas Processing Platform, Accommodation Platform and Jacket Leg Strengthening
2020 ADYARD ADNOC Subsea Pipeline Mitigation UAE Pipeline Supports – Concrete Mattresses
2019 McDermott Qatar Petroleum Bul Hanine Redevelopment Qatar Freespan Rectification – Grout Bags & Grouting services
2019 Max Infrastructure Limited Roppur Nuclear Power Plant 2.4GW Nuclear Power Plant Bangladesh Supply of Concrete Mattresses
2018 NPCC BAPCO Grout bags and matts Bahrain Pipeline Supports – Grout bags, Concrete Mattresses & Grouting services
2018 Saipem Saudi Aramco LTA-2 19 No. SSS Platform Project Saudi Arabia Structural grouting – Platforms
2017 McDermott Saudi Aramco LTA 12- Platform Project Saudi Arabia Structural grouting – Platforms
2015 Seaway Heavy Lifting (SHL) GDF Suez E&P Cygnus Development England Structural grouting – Wellhead platforms
2014 McDermott Saudi Aramco LTA Hasbah & Arabiyah Fields Saudi Arabia Structural grouting – Platform jackets
2008 HHI ADMA-OPCO Umm Shaif Super Complex UAE Structural grouting – Platforms, Flare & Bridge towers
2007 Valentine Reliance, India Jamnagar Export Refinery Project India Structural grouting – Platforms & PLEM’s
2006 Yarimkure/ Hemisphere Shell Turkey-Greece PL Turkey- Greece  Pipeline support – Concrete Mattresses
2004 Marine Consultant AGIP 34” Gela –Sicily (Italy) Italy  Pipeline support – Fabric formwork & Grouting services
2000 Amerada Hess SeaMark Hudson U3/UK United Kingdom Fabric Formwork supply
1988 Oceaneering Advanced Marine Indonesia Indonesia Supports with Scour Skirts Straps
1981 Total Oil Marine Star Offshore / Wharton Williams Frigg, North Sea Norway Pipeline Support/Stabilization

ADYARD

ULO Systems FZC were contracted by ADYARD Abu Dhabi to manufacture and supply 166 Articulating Concrete Mattresses (ACM) for the “18 inch PIPELINE MITIGATION PROJECT” for ADNOC Offshore.

The Project involved converting an 18” Pipeline from Gas/ Water Injection to Oil Service, for a temporary phase of 1.5 years.

The conversion scope included pipeline free span correction, pipeline stabilization and pipeline buckle mitigation.

At the design engineering stage, ULO Systems provided its engineering support to ADNOC Offshore and Worley pipeline engineers to optimize the mattress system and its implementation.

The ACM were 12 meters long and 4 meters wide and were made up of three (3) types.

Type 1 – Combination mattresses made up of 0.5 m high blocks and 0.9 m high blocks

Type 2 – Mattresses with a uniform thickness of 0.6 m

Type 3 – Mattresses with a uniform thickness of 0.9 m

The mattresses had weights ranging from 29 metric tonnes to 40 metric tonnes in air.

The entire mattress production was completed in less than 2 months despite the ongoing COVID -19 challenges.

Sakhalin Island

THE CHALLENGES
Mix and pump 6,100 cu m of grout (comprising cement, sodium silicate and sea water) from a DSV with a confined deck space into 17 under base compartments via a manifold control panel to an extensive piping system in a continuous 72 hour period.

PREPARATION
A conventional mixing and pumping system was developed that had the required capacity but was also able to be transported by conventional road and sea freight methods. 100% immediately operational contingency equipment was also required. The functionality of the system was dependent upon an RJM having a mix tank of the correct size to ensure the vortex action was maintained. This was critical to the efficient mixing of the seawater, cement and silicate in sufficient quantity to meet the demands of the high capacity delivery pumps in a continuous operation.

OUTCOME
The under base grouting operation was successfully completed within 60 hours utilising the primary equipment and two operating crews. No downtime or injuries were sustained.

BANGLADESH

THE CHALLENGES
Challenging location and timelines. The nuclear plant is located in a rural area of Bangladesh on a riverbank. Due to weather conditions, the risk of flooding in the area is high and the plant’s proximity to the river has meant we have had to first establish a solid base to build upon. It was critical ULO Systems offered a long-term solution to protect the infrastructure and ensure the safety of the plant.

PREPARATION
Manufactured, delivered and installed 2,000 concrete mattresses, including 216,000 plastic shell pods, 648,000 clips and 568,000 metres of rope. Utilised an advanced MDS 3 lifting frame, capable of deploying three mattresses simultaneously.

OUTCOME
Project completed ahead of time to client’s full satisfaction