ULO has provided services to the offshore wind farm industry for an excess of 15 years for singular or multiple unit installation projects globally in providing the grouting service not only for the piles into the seabed where applicable and or the connecting piece in the upper and lower segment of the main stem in connection with monopole units and or structural stability of the offshore structure for the multiple leg structures.
ULO has provided equipment, personnel and materials and has effectively executed these as a stand alone contractor to provide the grouting service in a time efficient manner.